Episode 215 of Do It For A Living is part two of a two-part manufacturing series. Host Kevin Dubois and co-host Richard Fielder, Kevin's partner at Evolution Dynamics, pick up where episode 213 left off after standard operating procedures. Richard brings manufacturing experience from his day job, and Kevin tests each idea against their own Evo shop.
This episode covers four topics: poka-yoke and error-proofing, kanban, lean manufacturing, and just-in-time inventory. Each comes with examples from performance parts and engine work, and with a view on whether a small shop can use it.
Poka-yoke: parts that only go together one way
Richard defined poka-yoke as designing a part so it can only be assembled one way. It starts with whoever designs the component. If you service cars, the automaker has already done most of this for you. If you make parts, it's your job.
His example was the Evolution Dynamics flex fuel kit for the Evo 8 and 9. The bracket that mounts to the engine isn't symmetrical, and the bolt pattern is different in every direction. It fits one way, the sensor goes in, and a single bolt holds it to the car. Their surge tank is built the same way.
A brake disc only goes on one way, but a brake pad can go in backwards. Where a part can't be made one-way, makers stamp it instead, like cams marked intake and exhaust.
Richard pointed to two factory examples from the Evo world. The Evo 8 front cover has bolts that must go back in their original holes, and any bolt fits any hole. A bolt in the wrong hole may not torque, may break a tab or may fall out. The Evo X front cover uses only two bolt sizes, and the bolts of each size are identical, so it can only go together one way.
Error-proofing on the bench
Error-proofing is what you do during the work itself. Richard pointed to a 3D-printed holder that keeps valves and buckets in order as an engine comes apart: intake one, intake two, intake three.
Kevin admitted the opposite habit. When he takes apart an Evo X head, every bucket is sized for its own valve. He records each size in a spreadsheet and then dumps the buckets in one bin. Without the spreadsheet, the only way back is to assemble, measure, take it apart and repeat until everything is sorted. Richard called all of that sorting non-value-added time.
The shared bolt bin is the same problem. Finding one M8 x 40 in the pile can take ten minutes. A labeled fastener assortment fixes that, and so do labeled compartments for each group of bolts during disassembly.
When it's worth the effort
Richard's rule was to error-proof when a wrong assembly can hurt something or costs a lot of time.
For parts customers install themselves, it is about the user experience. Kevin mentioned an aftermarket Evo 8 intake pipe he often sees installed backwards. It doesn't hurt performance, so Richard would just label it or put a boss on one end. A novice who spends four hours redoing a one-hour install writes a bad review. Blow-off valves are worse, since one installed backwards may flutter or not hold boost.
Loose hoses and fittings in catch can and oil cooler kits drew the most complaints. Richard's fix is to pre-assemble one end of each hose, so half the work is done and the upper and lower hoses can't be confused. Kevin noted that one power steering hose maker leaves a single hose unassembled because the distance between reservoir and pump varies from car to car. A break-away paper tag works too, or one photo of the kit with colored dots that match dots on each hose.
Kanban for inventory
The original kanban was a card in a parts bin. Say you keep 10 seals on the shelf and want to reorder at three. When someone reaches the card, they take it to whoever orders parts. Modern systems do this with a scan, a message or a line on a purchase order. Richard noted My Shop Assist does it by scanning codes with a phone or barcode scanner.
Getting the reorder point right takes watching your usage and lead times. If three seals last six weeks and you can get more in two days, your reorder point is too high. If a part comes from overseas and could take three days or two months, carry more.
Kanban for workflow
The same idea tracks jobs. In My Shop Assist, each job sits in a zone, and you move it by scan or by click. You always know where it stands, and you can see when a zone backs up. If disassembly is full, move two techs there for the day.
Kevin has tried this on their e-commerce orders, with four zones for new orders, drop-shipped orders, parts they manufacture and parts already on the shelf. He compared the next step to a tire shop that texts you as your car moves through each stage.
One-off work fits too. When you do know the steps, list them, because the list helps you quote. Kevin described how their engine builds grew from one line on the invoice to six steps: remove engine, disassemble, machine block, assemble short block, assemble long block, install. Each step captures its own labor, and steps that don't apply get skipped. There is a point of diminishing returns, so don't break small jobs into so many steps that tracking eats the profit. MSA allows one timer per job or one per task.
Lean: find the waste first
Richard described lean as a way to become more efficient, and the first step is finding out how inefficient you are. Run timers on jobs. Draw a spaghetti diagram of your trips for tools. If you work only on imports, move the SAE tools out of your box so they stop slowing you down.
Waste comes in many forms. It can be labor, parts installed two or three times, or fluid changed more often than needed. A filter on an ultrasonic cleaner can stretch fluid changes, which matters when a refill with RO water keeps the machine down for over a day. A part that arrives damaged costs twice, once for the part and again in calls, the RMA and a car sitting for a week or two.
How far to take it depends on your philosophy. Kevin brought up Injector Dynamics, which tests every injector. Richard said that fits a goal of zero failures out of the box. That reputation lets them charge for it, while cheaper brands accept more defects.
It's based on how you want to run your business.
In their own shop, Richard said the next lean step is getting a newer tech up to speed. Once a tech is fast enough to do three clutches in the time one used to take, the shop turns jobs faster and makes more. Shadow boards, standard work and a kanban list waiting each morning all shorten that learning curve.
Richard believes a two-person shop can do this. Ten years ago their shop wasted parts, labor and customers' time, and the lot was full of cars waiting. Friends of theirs who started around the same time and figured these things out sooner are further ahead now.
Just-in-time without running out
Just-in-time, made famous by Toyota, treats a warehouse full of parts as waste. Money sits on the shelf, and some of it never turns over, like ordering 10,000 washers and selling 500.
I'm not saying don't buy in bulk. I'm not saying don't stock parts. I'm saying be smart and strategic about what you're doing.
Their shop won't stock four turbo kits for one car, because every customer wants a different color, bend or turbo. They order to the build schedule. If a supplier has 10 of a gauge on the shelf and the engine is two months out, they wait. Ordering for two upcoming builds at once can bundle shipping. Manufacturers can let dealers hold the stock, and large inventories can bring tax costs. The risk runs the other way too. A sudden run on a part, or a supplier who won't make it for six months, leaves you with nothing to sell.
Key takeaways
- Design parts you sell to fit only one way, or label them clearly, so the customer's first install is right.
- Keep disassembled parts in labeled, ordered holders. Sorting a mixed bin later is pure lost time.
- Set reorder points from real usage and lead times, and carry more of anything with unreliable supply.
- Break repeat jobs into steps you can track and quote, but stop before tracking costs more than it saves.
- Start lean by measuring with timers and a spaghetti diagram before changing anything.
- Order to your build schedule and check supplier stock instead of filling shelves.
Putting these systems to work with My Shop Assist
Several ideas from this episode are already built into My Shop Assist. Zones show where every job sits. Scanning a code can move a job or flag a reorder. Per-task timers show how long each step really takes, which helps with quoting and with finding waste. Small manufacturers and parts makers can see more on the My Shop Assist page for manufacturers.
To set up your own zones and timers on real jobs, start a free 30-day trial.
Related episodes: 213 - 5S, Shadow Boards and Bills of Materials for Small Shops and 211 - Building a Parts Dealer Network with ECU Master USA.




